Many sections of the Occupational Health
and Safety Regulation and Workers Compensation Act (WCA) have associated
guidelines. Guidelines are intended to assist with providing ways of
complying with the legislation, not to provide exclusive interpretations.
Guidelines generally provide information on administrative matters and on
technical matters not already addressed by policy. Periodically,
guidelines are updated and new ones added. The following list shows the
new and updated guidelines for 2002.
Guidelines for the Act
- G-D12-187-1
Worker Orders

[Issued October 31, 2002]
- G-D12-188(4)
Extension of implementation period

[Issued May 15, 2002]
- G-D3-124
Responsibilities of the persons/parties in a workplace

[Issued March 28, 2002]
Guidelines for the Regulation
- G13.18
Manufactured scaffold components
[Issued May 15, 2002; Revised December 31, 2002]
- G14.34(3)
Implementation period for operator qualifications
[Issued February 27, 2001; Revised December 31, 2002]
- G16.18(3)
Two lever or joystick controls
[Issued February 27, 2001; Revised December 31, 2002]
- G17.15
to 17.26 Marine craft
[Issued February 27, 2001; Revised December 31, 2002]
- G26.12
Implementation period for vehicle load limits
[Issued March 1, 2000; Revised December 31, 2002]
- G26.22(2)
to (4) Implementation period for faller training
[Issued March 1, 2000; Revised December 31, 2002]
- G24.13-1
Evidence of competency for scientific divers

[Preliminary Issue November 29, 2002]
- G7.14
Selection of hearing protection
[Issued August 1999; Revised October 31, 2002]
- G7.15
Warning signs and hearing protection
[Issued August 1999; Revised October 31, 2002]
- G7.17-1
Annual hearing tests
[Issued August 1999; Revised October 31, 2002]
- G7.17-2
Construction industry
[Issued August 1999; Revised October 31, 2002]
- G7.18
Authorized hearing test contractors
[Issued August 1999; Revised October 31, 2002]
- G7.33
Application for ionizing and non-ionizing radiation
[Issued August 1999; Revised October 31, 2002]
- G7.34-1
General requirements -- Exposure control plan
[Issued August 1999; Revised October 31, 2002]
- G7.34-2
Ionizing radiation
[Issued August 1999; Revised October 31, 2002]
- G7.34-3
Non-ionizing radiation
[Issued August 1999; Revised October 31, 2002]
- G7.34-4
Control measures
[Issued August 1999; Revised October 31, 2002]
- G7.35-1
Acceptable standards
[Issued August 1999; Revised October 31, 2002]
- G7.35-2
Safety Code 6 (Radiofrequency)
[Issued August 1999; Revised October 31, 2002]
- G7.36
Personal protective equipment
[Issued August 1999; Revised October 31, 2002]
- G7.37
Education and training
[Issued August 1999; Revised October 31, 2002]
- G7.39-1
Exposure limits
[Issued August 1999; Revised October 31, 2002]
- G7.39-2
Measurement of radiation dose
[Issued August 1999; Revised October 31, 2002]
- G7.39-3
Exposure in excess of the Exposure Limits
[Issued August 1999; Revised October 31, 2002]
- G6.8
Procedures for abatement of asbestos-containing material (ACM) during
house and building demolition/renovation

[Preliminary Issue July 5, 2002]
- G26.22(2)
to (4) Implementation period for faller training
[Issued March 1, 2000; Revised July 5, 2002]
- G4.79
Moulds and indoor air quality

[Issued June 14, 2002]
- G5.54-7
Drywall sanding requirements

[Issued June 14, 2002]
- G7.55-2
Environmental parameters
[Issued August 1999; Revised June 14, 2002]
- G7.55-3
Physiological measures
[Issued August 1999; Revised June 14, 2002]
- G7.55-4
Heat stress assessment using a dry bulb thermometer only

[Issued June 14, 2002]
- G8.33-1
Scott II and IIA SCBA regulator donning switch hazard

[Issued June 14, 2002]
- G5.54-5
Health monitoring
[Issued August 1, 1999; Revised June 7, 2002]
- G6.27
Asbestos waste removal

[Issued May 24, 2002]
- G9.49
Removal of oxy-fuel torches and hoses from confined spaces

[Issued May 24, 2002]
- G12.102(1)
Abrasive blasting cleanup
[Issued May 24, 2002]
- G12.124
Respiratory protection and provision of ventilation for welding,
cutting and allied processes

[Issued May 24, 2002]
- G13.18
Manufactured scaffold components

[Issued May 15, 2002]
- G14.34(3)
Implementation period for operator qualifications
[Issued February 27, 2001; Revised May 15, 2002]
- G16.18(3)
Two Lever or Joystick Controls

[Issued May 15, 2002]
- G17.15
to 17.26 Implementation period for marine craft requirements
[Issued February 27, 2001; Revised May 15, 2002]
- G19.42
Implementation period for equipment approval

[Issued May 15, 2002]
- G26.12
Implementation period for vehicle load limits
[Issued March 1, 2000; Revised May 15, 2002]
- G26.67(6)
Logging truck load specifications
[Issued March 1, 2000; Revised May 15, 2002]
- Guidelines
G4.81 to G4.83(11) Environmental Tobacco Smoke
[Issued March 28, 2002; Revised May 1, 2002]
- G16.7(j)
Lift truck operator training

[Issued April 25, 2002]
- G11.2(5)(c)
Fall protection and structural concrete block construction

[Issued March 28, 2002]
|